HOME     About us  |   News  |   Business  |   Trading Network  |   Knowledge  |   Download  |   Message
客服A
点击这里给我发消息
客服B
点击这里给我发消息
客服C
点击这里给我发消息
客服D
点击这里给我发消息
About Harvest

News
Network Rail moves sleeper production facility
Published:2018-11-17   Have been here 59   Source:泓威国际物流

Rob Morton, supply chain operations director for Network Rail, said: “Bescot remains the preferred location for this facility but having listened to the concerns raised with us, it was clear changes had to be made.

“We went back to the drawing board and reworked our proposals so the impact on the area is even less than before. This is a vital facility for the rail industry but we want to do all we can to deliver it with the least impact on the surrounding area.”

The new plan involves relocating the facility east of the original site so that it is 500m further away from houses on Westmore Way.

There will now be a new link road that will take traffic to the facility direct from the A4031, to avoid passing any houses on Sandy Lane. And vehicle movements will be directed to the site from Junction 1 of the M5, while vehicles leaving the site will use the original route back to Junction 9 of the M6.


PRINT】 【CLOSE】 【TOP】 【Back to News list
Shanghai Harvest International Logistics Co., Ltd 
TEL:021 - 63244486 63078395 FAX:021 - 63244312  E-mail:jolie@harvest-log.com
Address:Room 712, Building 2, Shanghai Office Building, No.1250, North Zhongshan No. 1 Road, Hongkou District, Shanghai, China